CP 2627 (CP 2600)

Alsthom Sorefame CP 2627 and EE CP 1415 with a catenary inspection coach to perform inspection work between the recently electrified section of Valença to Viana do Castelo.
With this last section finished, the "Minho line" from Porto to the Spanish border at Valença, is now fully electrified with 25kV 50Hz.

329 6 100 18-02-2021
NIKON D7100
Exposure: 1/320
Aperture: F/3.5
Focal length: 38 mm
ISO: 3200
Time: 18:17:34