Tags
CP 2601 (CP 2600)
CP 2601 pushing back 8 out of the 15 Sorefame coaches that it had brought from Contumil to Figueira da Foz. CP 1181 took over the shunting duties on the non electrified section of the yard.
13 of those Sorefame coaches are decommissioned and ordered to be stored inside EMEF works at Figueira da Foz waiting for a better future. The remaining two coaches and 2601 returned on that evening to Guifões works with two Sentinel/Rolls-Royce shunters for complete overhaul.
445 14 100 | 21-12-2020 |
NIKON D7100 Exposure: 1/800 Aperture: F/8 Focal length: 40 mm ISO: 200 Time: 13:19:18 |
![]() |